A Sample of Our Projects

Sapphire Falls Hotel
Universal Studios, FL

KENPAT Fireproofing worked on this large multi story resort at Universal Studios with a fast pace schedule. We applied standard density fireproofing throughout and we also sprayed black and grey K-13 in exposed areas in the resort. Multiple crews and 56-hour work weeks were a job requirement. This was one of our bigger projects, and even with the fast pace of theme park work it was very successful.

 

Oviedo Hospital
Oviedo, FL

This was another fast-paced hospital project working jointly with KENPAT Central Florida and Layton Construction. This was standard density fireproofing that was completed ahead of schedule despite having lots of trades trying to complete this fast-paced project at the same time.

 

Restoration Hardware
West Palm Beach, FL

This multi-phase job was being built right in the middle of the traffic lanes in downtown West Palm Beach. We applied medium density fireproofing and Intumescent paint on a project that was only half done as we waited for building modifications to be completed. With high-quality finished concrete floors, it was a must to protect those floor as we worked. With a very happy repeat customer, everyone was pleased with our work when we were finished.

 

Porsche Design Tower
Sunny Isle, FL

KENPAT Fireproofing provided a 2 hour rating to the top of the elevator shafts that are used to bring the tenant's cars up to their residences. Lath was installed to the metal decking and High Density Fendolite was applied to the lath and beams.

 

AMC Theatre-Universal Studios
Orlando, FL

This was a 12 week schedule that involved erecting dance floor scaffolding in the theaters, demolition of the existing ceilings, installation of Cafco Fireproofing Board over spray-applied fireproofing and reinstallation of the grid and acoustical ceiling tiles.

 

Cosmo International Fragrances
Deerfield Beach, FL

Cosmo International Fragrances contracted Miller Construction Company to fully renovate a 93,955-square-foot production, distribution and office facility within Newport Center business park in Deerfield Beach, Florida. KENPAT Fireproofing provided Cafco Board, Applied Fireproofing and Metal Framing for the project.

 

Universal Studios - Mulitple Projects
Orlando, FL

KENPAT Fireproofing worked on six (6) projects at Universal Studios Orlando, with much of the work being done during Park operational hours.The scope of work included Sprayed Fire-Resistive Material and both solvent and water-based intumescent paints. KENPAT Fireproofing got involved in every aspect of the project from the design process, to mean & methods as well providing adequate manpower to complete the work in a limited time frame.

 

Cleveland Clinic NICI
Westin, FL

This was a large ground-up structure encompassing 5 stories and 130,000 SF of space. The Neurological and Cancer Institute was constructed by Turner Construction. KENPAT Fireproofing used a variety of products on this project including standard and medium density sprayed fire-resistive materials, and both interior and exterior intumescent paint. KENPAT Fireproofing’s base contract portion of their work was completed in approximately 8 weeks.

 

Eustis Heights Elementary School
Eustis, FL

Allstate Construction, Inc hired KENPAT Fireproofing to assist with this new, ground-up school construction. An interesting side point is that all of the workers were required to have a complete background and fingerprint check to work on this project. This was a multi-story classroom structure that required standard density sprayed fire-resistive materials throughout.

 

Crosstown Center
Brandon, FL

This was a very large, 263,000 SF office and call center for USAA Insurance that was built by Holder Construction out of Atlanta, GA. Of special interest, KENPAT Fireproofing was called on to provide a wide range of disciplines for this project including spray fire-resistive materials, spray-applied acoustical products, intumescent paint, slab-edge fire containment systems and closed cell spray foam. This project is an excellent example of the wide range of scopes that KENPAT Fireproofing can provide.

 

Long Cove Club House
Hilton Head, SC

Choate Construction was asked to construct the main clubhouse for this community. KENPAT Fireproofing was called in to provide Pyrok Acoustical Spray in the Bar and Formal and Private Dining Rooms. The acoustical spray was applied to the ceilings and was left exposed after being troweled and finished to create a beautiful and functional touch to top off these rooms.

 

Poinciana Medical Center
Kissimmee,FL

This project was a 2 story vertical expansion over an existing operational 2 story hospital under contract with Robins & Morton Construction Company. The challenge with doing a vertical expansion over an existing hospital is to have precise coordination with other trades and be able to execute your work in the allotted time frame. With the required cementitious fireproofing, protection of all existing finishes and existing roof top mechanical systems, while working safely were also critical.

 

Menchies Yogurt
Universal Studios, FL

Intumescent paint on a column at Menchies Yogurt Shop at Universal Studios. Intumescent paint provides the same level of protection as traditional spray fire resistant materials, but creates an attractive paintable surface allowing the end result to be left exposed to the public.

 

Saint Joseph Hospital Cancer Center
Tampa, FL

Saint Joseph Cancer Center is what is known in the fireproofing industry as a “retro-fit” project, meaning that we had to repair/replace the existing fireproofing with the majority of the overhead Mechanical, Electrical and Plumbing already in place. This picture clearly shows the degree of difficulty involved in a project such as this.

 

Winter Park Hospital Imaging Center
Winter Park,FL

This project was a relocation of the imaging center and our scope of work included adding traditional spray fireproofing. Not only did we need to protect the new steel in accordance with current standards, but we also had to upgrade a small portion of the existing facility to meet current code requirements.

 

Royal Pacific Hotel Ballroom
Universal Studios, FL

KENPAT Fireproofing  completed the spray applied fireproofing at the Royal Pacific Ballroom for General Contractor Hensel-Phelps. The project encompasses approximately 70,000 SF and was completed ahead of schedule.

 

Restoration Hardware
Tampa, FL

KENPAT was awarded the contract to supply Spray Applied Insulation and Applied Fireproofing for this new Restoration Hardware project by Whiting-Turner Construction. The store rises three stories tall and spreads out over a 47,000-square-foot space.

 

NBC Sports Grill & Brew
Universal City Walk,FL

KENPAT Fireproofing was awarded the contract to provide Applied Fireproofing, Acoustical Spray Insulation, Acoustical Plaster, and Intumescent Paint in the new NBC Sports Grill & Brew (formerly NASCAR Restaurant) by General Contractor HW Davis.